|
Element 15: Biosolids Program & EMS
Performance Report
The Encina Wastewater Authority (EWA) must complete a
periodic, written Biosolids Management Program Performance Report (at least
annually) summarizing the performance of its biosolids management program.
The report must contain appropriate summaries of monitoring, measurements
and other results that demonstrate the performance of the biosolids program
relative to the EWA’s goals, objectives and legal requirements,
including those biosolids management activities conducted by contractors.
The report must also provide summaries of performance relative to other
voluntarily adopted requirements, the EWA’s progress toward achieving
its biosolids program goals and objectives and a summary of its independent
third-party EMS verification audit
results.
The periodic
Biosolids Management Program Report must be available to the public. The
EWA must have the flexibility of using other methods, including electronic
methods such as a biosolids program web page in addition to or in lieu of a
written periodic performance report.
ELEMENT 15
DOCUMENT:
Objective
Definitions
Summary
Procedures
Documentation & Responsibility
Checklist
|